On-site Analysis Services
TER's on-site Mobile Analysis Service for technology evaluation and recommendation provides well operation performance and design for rod pump wells. With TER's selfontained van at the well ,ite, calibrated !ansducers gather real ime data for analysis. Complete surface and down hole analysis is accomplished via easy-to-read report, graphics and summary of recommendation.

Plunger Lift Controller
Plunger Lift Technology is an artificial lift mode with low initial expenditures, simple installation, and low annual maintenance. It eliminates paraffin asphaltene and scale deposition in down hole tubing. The well's own energy powers the system thus eliminating the high cost of external sources. Candidates for plunger lift technology are high GOR (Gas-Oil-Ratio) and gas interference rod pumped wells. Well production is maintained to economic depletion.

Gas Injection Control
The TER Wellhead Monitor optimizes injection flow to match a determined flow rate, and computes the estimated gas-oil-water , production in real time in gas lifts production sites The solar powered telemetry-based system interfaces to masTER ? software which provides complete control of the injection well. The wellhead monitor is expandable to meet individual customer requirements.

Pump Off Control
Z-Flow takes advantage of advanced algorithms from the NIST group for volume calculations in WAG (Water Alternating Gas) wells. Z-Flow accurately measures C0 2 and natural gas flow through differential producing devices, such as wedge meters and orifice type flow meters. Accurate calculations of density, viscosity and heat capacity ratio are performed at actual pressure and temperature conditions of the flow line. Final results are based on the specific component mixture of the measured fluid, and are within 0.6% of densitometer systems.

Flow Measurement


Copyright 2002 Eastern Energy Services (Thailand) Co.,Ltd.